Table of Contents

Infrastructure Package

Item Value
Catalog item Empower – Infrastructure
DOM module empower_infrastructure
View Empower/Infrastructure
Element prefix INF

Data Model

erDiagram
    INFRASTRUCTURE_SYSTEM ||--|{ CRITICAL_ASSET : "consists of"
    INFRASTRUCTURE_SYSTEM ||--|| DATAMINER_SERVICE : "linked by ID"
    CRITICAL_ASSET ||--|| DATAMINER_ELEMENT : "linked by ID"

Infrastructure System

Field Type Example
Name Text Airport Operations Network
Operator Text Airport Authority
Region Text Brussels
Criticality Enum: Low · Medium · High · Critical Critical
Users Served Number 65000
System Owner Text Wim Goossens
Control Room Text Airport Operations Center
Escalation Threshold (min) Number 15
DataMiner Service ID set by the install script

Critical Asset

Field Type Example
Name Text Battery Storage System
Infrastructure System DOM link → Infrastructure System Renewable Energy Monitoring
Asset Class Text Storage
Site Text Battery Site Liège
Rated Capacity (MW) Decimal, optional 8
Limit Parameter Text, optional Cell Temperature °C
Operating Limit Decimal, optional 50
DataMiner Element ID set by the install script

Seed Data

Infrastructure Systems

Name Operator Region Criticality Users Served System Owner Control Room Escalation (min)
Airport Operations Network Airport Authority Brussels Critical 65,000 / day Wim Goossens Airport Operations Center 15
Smart Campus Platform University Campus Leuven Medium 25,000 Julie Vermeulen Facilities Control Room 60
Renewable Energy Monitoring Energy Cooperative Wallonia High 40,000 households Marc Lambert Energy Control Room 30

Critical Assets

Infrastructure System Name Asset Class Site Rated Capacity Operating Limit
Airport Operations Network Core Switch Network Terminal A – –
Wi-Fi Controller Network Terminal B – –
Baggage Handling Gateway Baggage System Baggage Hall – –
Smart Campus Platform Building Management System Building Systems Building North – –
Access Control Server Security Building South – –
IoT Gateway IoT Parking Area – –
Renewable Energy Monitoring Solar Inverter Park Generation Solar Park Namur 12 MW –
Wind Turbine Controller Generation Offshore Wind Farm 30 MW –
Battery Storage System Storage Battery Site Liège 8 MW Cell Temperature 50 °C

Real-Time Data

Thresholds are Minor / Major / Critical unless stated otherwise.

Element Key parameters (thresholds)
Core Switch Port Utilization % · CPU %
Wi-Fi Controller Connected Clients · Access Points Down (> 2 / > 5 / –)
Baggage Handling Gateway PLC Connection (Lost = Critical) · Bags/hour
Building Management System HVAC Status · Room Temperature °C
Access Control Server Doors Offline (> 0 / > 3 / –)
IoT Gateway Sensors Online % (Warning < 90)
Solar Inverter Park Power Output MW · Inverters Offline (> 0 / > 2 / –)
Wind Turbine Controller Power Output MW · Wind Speed m/s
Battery Storage System State of Charge % · Cell Temperature °C (> 40 / > 45 / > 50)

Problems

Problem Key question Data needed Seeded answer
Operations Control Center What requires action now? Criticality · service alarm state · active alarms Baggage Handling Gateway (Airport Operations Network) – PLC connection lost (Critical) on a Critical system.
Critical Asset Dashboard Which assets represent the highest risk? Operating Limit · Criticality · element parameters · 24 h trend · alarms Battery Storage System – cell temperature rising 32 → 43 °C in 24 h (Minor), fastest-deteriorating asset heading towards its 50 °C limit.
Regional Operations View How are locations performing? Site · Region · Rated Capacity · Power Output · alarms Solar Park Namur is underperforming – 3 inverters offline (Major), 4.1 of 12 MW.
Tip

The Baggage Handling Gateway (already failed) versus the Battery Storage System (about to fail) is a good discussion point: incident versus risk.

Scenario

Time Element Change Alarm
T0 − 24 h → T0 Battery Storage System Cell Temperature 32 → 43 °C Minor from 40 °C
T0 Baggage Handling Gateway PLC Connection Lost Critical
T0 Solar Inverter Park 3 inverters offline, output 4.1 MW Major
T0 IoT Gateway Sensors Online 87 % Warning